Canalworks

Lining 5x4'

Exhibition and related events exploring major engineering works on the Monmouthsire & Brecon Canal.

During the winter of 2016 /17 the Llangattock stretch of the canal was closed and drained for repair and re-lining, interrupting the flow of water and navigation from the Beacons to the Sea. This exhibition shows these engineering works in progress, in the context of industrial heritage and the interchange of human and natural forces. Painting, drawing, video and found objects from the canal, its feeder streams and the interconnecting network of paths, tramways and roads. For more on this see Canalworks blog and Canalchemy

Response to Canalworks: Allen Fisher_Hallas Towpath 1 initial analysis subsequent consideration

Exhibition: 5 Oct – 11 Nov. Andrew Lamont Gallery, Brecon, LD3 7EW
Poetry and Performance: 4 Nov 5.30 – 6.30 with GhostJam and Canalchemy.

Canal walk: 29 Oct 2-4pm with Kevin Phillips of Canal and River Trust

Leave a Reply